Ok, bad news. We just heard from the builder today and they told us our house will now be finished towards mid-OCTOBER. What?! Ugh... more waiting. Maybe at least we'll be able to be in before Halloween.
Meanwhile, the builders are working away... tonight, they were working when we went up to visit around 7:30pm! Not on our house, but on another one down the street that is at the same stage as ours.
Lots of things happening this week! See if you can tell.
Here's our progress point picture. Notice anything?
Ok, how about now. I'll give you a hint. It's NOT the landscaping.
Ok, you'd have to be blind not to notice now.
Ok, you guessed it. We have a front porch!! Well, we have a front porch PLATFORM. We're still missing the actual porch itself, which overhangs from the house. That should be coming soon...I hope.
But then again, I tend to be very over-optomistic in this whole construction process.
There were some other things that happened today and yesterday. Mr. Plumber man came out and fixed us up with some rather nice PVC pipes.
See? Boooorrrriiinnnnggggg....
Here's a good view of the first floor. Stairs that go up (always good news), garage to the left there, front door down the hallway, kitchen to the immediate right, dining room down the hall on the right. This will all look more cohesive once we have some drywall.
Here, we take you to our master bathroom. The've put in the tub and shower basin (in both upstairs bathrooms). Yay! Now we can take showers occasionally, and maybe give Killian a bath while we're at it.
And now for my Photoshop masterpiece.
Anyone who makes fun of me for this will automatically loose five points. (That goes for my "ode to the gas line" post as well...Ahem, Mom B!!!) Just kidding. Not not really. Please don't make fun.
I'm tired. I'm going nuts, and I want to move in. If I camped out on my garage floor overnight, do you think the builders would kick me out in the morning?
Please forgive me for that last picture. Sometimes I get a little carried away.
I quit. Good-bye forever.
But not before a schedule update! I'm going to start from Day #32 since the list is getting a little long. If you want to see the whole schedule, look down a post and you'll find it there. I'm just adding on.
Day #32 - Friday, July 17, 2009: Roof and framing finished.
Day #33 - Saturday, July 18, 2009: Tar tape on roof, ready for shingles!
Day #35 - Monday, July 20, 2009: Sheet Metal Work started.
Day #36 - Tuesday, July 21, 2009: Front Door delivered!
Day #38 - Thursday, July 23, 2009: HVAC Work mostly complete. Gas line installed.
Day #39 - Friday, July 24, 2009: Outside edging complete. Plumber dropped off pipes.
Day #42 - Monday, July 27, 2009: Plumbing mostly complete. Exterior edging complete.
Day #43 - Tuesday, July 28, 2009: Shingles delivered, front porch concrete poured!
Meanwhile, the builders are working away... tonight, they were working when we went up to visit around 7:30pm! Not on our house, but on another one down the street that is at the same stage as ours.
Lots of things happening this week! See if you can tell.
Here's our progress point picture. Notice anything?
Ok, how about now. I'll give you a hint. It's NOT the landscaping.
Ok, you'd have to be blind not to notice now.
Ok, you guessed it. We have a front porch!! Well, we have a front porch PLATFORM. We're still missing the actual porch itself, which overhangs from the house. That should be coming soon...I hope.
But then again, I tend to be very over-optomistic in this whole construction process.
There were some other things that happened today and yesterday. Mr. Plumber man came out and fixed us up with some rather nice PVC pipes.
See? Boooorrrriiinnnnggggg....
Here's a good view of the first floor. Stairs that go up (always good news), garage to the left there, front door down the hallway, kitchen to the immediate right, dining room down the hall on the right. This will all look more cohesive once we have some drywall.
Here, we take you to our master bathroom. The've put in the tub and shower basin (in both upstairs bathrooms). Yay! Now we can take showers occasionally, and maybe give Killian a bath while we're at it.
And now for my Photoshop masterpiece.
Anyone who makes fun of me for this will automatically loose five points. (That goes for my "ode to the gas line" post as well...Ahem, Mom B!!!) Just kidding. Not not really. Please don't make fun.
I'm tired. I'm going nuts, and I want to move in. If I camped out on my garage floor overnight, do you think the builders would kick me out in the morning?
Please forgive me for that last picture. Sometimes I get a little carried away.
I quit. Good-bye forever.
But not before a schedule update! I'm going to start from Day #32 since the list is getting a little long. If you want to see the whole schedule, look down a post and you'll find it there. I'm just adding on.
Day #32 - Friday, July 17, 2009: Roof and framing finished.
Day #33 - Saturday, July 18, 2009: Tar tape on roof, ready for shingles!
Day #35 - Monday, July 20, 2009: Sheet Metal Work started.
Day #36 - Tuesday, July 21, 2009: Front Door delivered!
Day #38 - Thursday, July 23, 2009: HVAC Work mostly complete. Gas line installed.
Day #39 - Friday, July 24, 2009: Outside edging complete. Plumber dropped off pipes.
Day #42 - Monday, July 27, 2009: Plumbing mostly complete. Exterior edging complete.
Day #43 - Tuesday, July 28, 2009: Shingles delivered, front porch concrete poured!